Skip to content
GENEQ Technology
About
ABOUT GENEQ
  • CEO Message
  • Company Overview
  • Organization
  • History
  • Certifications
  • Locations
Aerospace
Energy Systems
ENERGY SYSTEMS · PRODUCTSView all products →
Air Compressors
  • Turbo Compressors
  • Screw Compressors
  • Maintenance
Air Dryers
  • Desiccant Dryers
  • Refrigerated Dryers
  • Utility Equipment
  • Track Record
Automation & Control
  • HMI System
  • Load Sharing System
  • Power SCADA
  • Track Record
CO2 Removal Systems→Gas Purification Systems→
Contact
  • KO한국어
  • ENEnglish
  • 中文简体中文
Admin login
ContactSend an inquiryCall us
Track Record›Automation & Control
Energy Systems · References

Selected Automation & Control References

Compressor and utility HMI, load sharing and sequence control, remote control and power SCADA: selected automation systems installed at production lines in Korea and overseas.

NOTypeProjectClientYear
01Utility control system & HMI integration (sequence operation)Compressor sequence control systemPOSCO (Argentina)2026
02Utility HMI (remote operation)Control valve replacement on special/general supply lines and remote control program updateK Shipbuilding (Jinhae)2026
03Power SCADASubstation room improvement worksK Shipbuilding (Jinhae)2026
04Utility control system & HMI integration (load sharing system)Load sharing program update for compressor replacement, machining utility buildingHyundai Motor (Ulsan)2026
05Utility HMI (remote operation)Remote control program update for compressor 2 and 4 and dryer replacementSamsung Heavy Industries (Geoje)2026
06Utility control system & HMI integration (load sharing system)Compressor load sharing system for lines C1 and C3Samsung Electronics (Cheonan)2026
07Utility HMI (load sharing system)Load sharing program update for IHI compressor replacement, utility room 1Kia (Gwangmyeong)2025
08Utility control system & HMI integration (remote operation)Compressor and dryer remote control systemLG Chem (Cheongju)2025
09Utility HMI (remote operation)Compressor expansion and remote control program additionNexen Tire (Changnyeong)2025
10Utility HMI (sequence operation)Master control panel PLC replacement and sequence control program updateDanieli (Saudi Arabia)2025
11Utility control system & HMI integration (monitoring)Monitoring system for transmission repair buildingHyundai Motor (Ulsan)2025
12Utility control system & HMI integration (load sharing system)Load sharing system update for replacement of 4 compressors, utility room 1Hyundai Motor (Ulsan)2025
13Utility HMI (monitoring)Compressor 2 PLC replacement and monitoring system program updateCJ CheilJedang (Incheon)2025
14Utility HMI (remote operation)Remote control system for compressors 16 and 17 and utilitiesSamsung Heavy Industries (Geoje)2025
15Utility HMI (load sharing system)Utility room improvement worksHyundai Motor (Asan)2025
16Environmental facility HMI (remote operation)Water treatment room HMI retrofitHyundai Steel (Dangjin)2024
17Utility control system & HMI integration (sequence operation)Compressor sequence control for cathode material plant phase 1POSCO Future M (Pohang)2024
18Utility HMI (sequence operation)Sequence control program update for 1 additional compressorSULB Steel (Bahrain)2024
19Utility HMI (remote operation)Dryer HMI remote control additionConstellation (Mexico)2024
20Utility HMI (remote operation)Compressor room 3: 1 additional compressor and dryer panel retrofitSamsung Heavy Industries (Geoje)2024
21Utility control system & HMI integration (load sharing system)Load sharing program update for P3 project compressor expansionSamsung Electronics (Godeok)2024
22Utility HMI (load sharing system)Compressor load sharing systemKia (Mexico)2024
23Utility HMI (sequence operation)Compressor sequence control systemGwangju Global Motors (Gwangju)2024
24Utility HMI (monitoring)Compressor monitoring system improvementMoorim P&P (Ulsan)2024
25Utility control system & HMI integration (sequence operation)Compressor sequence control for brine lithium phase 2 downstream processPOSCO (Gwangyang)2024
26Utility HMI (load sharing system)Compressor load sharing systemNexen Tire (Czech Republic)2023
27Utility HMI (sequence operation)Compressor sequence control systemHyundai Mobis (Changwon)2023
28Utility HMI (load sharing system)Compressor load sharing systemVMZ (Russia)2023
29HVAC HMI (remote operation)Remote control program update for additional system air conditioners, Bada buildingK Shipbuilding (Jinhae)2023
30Utility HMI (remote operation)Compressor and utility HMI supplementary worksDoosan Enerbility (Changwon)2023
31Utility HMI (load sharing system)Compressor load sharing systemHyundai WIA (Seosan)2023
32Utility control system & HMI integration (load sharing system)Compressor load sharing systemSamsung Electro-Mechanics (Sejong)2022
33Utility HMI (remote operation)Control valve control programSamsung Heavy Industries (Geoje)2022
34Utility HMI (remote operation)Compressor expansion and remote control program additionHanwha Aero Engines (Vietnam)2022
35Utility control system & HMI integration (sequence operation)Sequence control program update for HyperNO compressor expansionPOSCO (Gwangyang)2022
36Utility HMI (remote operation)Remote control program update for compressor replacementAirFirst (Pohang)2022
GENEQ Technology

From the ground to orbit, from the shop floor to the plant. Precision engineering in aerospace and energy systems that keeps Korean industry moving forward.

blogNaver Blog
Aerospace
Aerospace Division →
  • Aircraft Engine Test Facilities
  • Land Engine Test Facilities
  • Marine Engine Test Facilities
  • Gas Turbine Power Test Facilities
  • KSLV Launch Pad Control
View all products →
Energy Systems
Energy Systems Division →
  • Air CompressorsTurbo Compressors · Screw Compressors · Maintenance
  • Air DryersDesiccant Dryers · Refrigerated Dryers · Utility Equipment
  • CO2 Removal Systems
  • Gas Purification Systems
  • Automation & ControlHMI System · Load Sharing System · Power SCADA
View all products →
Headquarters · Changwon Plant
27-7, Gongdan-ro 166beon-gil, Seongsan-gu,
Changwon-si, Gyeongsangnam-do 51568, Republic of Korea
Tel. 055-600-8900
Fax. 055-600-8999
Asan Plant
145-7, Sandong-ro, Eumbong-myeon,
Asan-si, Chungcheongnam-do 31418, Republic of Korea
Tel. 041-532-2985
Fax. 041-532-2986
Gimhae Plant
10-31, Byeongdongsandan-ro, Hallim-myeon,
Gimhae-si, Gyeongsangnam-do, Republic of Korea
Jungbu Office
#217, M Tower, 12, Sandan-ro 16beon-gil,
Pyeongtaek-si, Gyeonggi-do 17746, Republic of Korea
© 2026 GENEQ Co., Ltd. All rights reserved.Republic of Korea· Aerospace & Energy Systems